Location

Emu Heights homes: choose the level that makes arrival easy

The best view and the easiest route from the car are not always at the same height.

Initial enquiries are welcome. We aim to reply within two working days.

Architectural concept model of one roofless house spanning two adjoining site bases, with a separate garage and right-hand driveway.


The best view and the easiest route from the car are not always at the same height. For an Emu Heights property with changing ground, we would draw the entry, kitchen and outdoor seat in section before deciding how the house should grow.

Penrith’s Eastern Escarpment development guidance applies to a mapped area and discusses siting with slope, views and vegetation. It does not apply automatically to every Emu Heights property. Where your site is within that area, the position of the house and driveway needs to be considered alongside existing vegetation and the view from the escarpment. Confirm current controls and bushfire advice for the address.

Architectural concept model of one roofless house spanning two adjoining site bases, with a separate garage and right-hand driveway.
Architectural concept: one house spans two model site bases, with a separate garage and driveway on the right.

Renovate the journey home

Follow the route from parking to the front door with shopping, then from the kitchen to the garden. A sheltered entry or a better landing may improve daily life without a major addition. If easier access is important, test where a bathroom and frequently used room can sit on the same level. Existing structure, drainage and services need assessment before changing floors.


Compare an extension against the ground

An addition aligned with the existing floor keeps movement simple inside but may leave the outdoor table above the garden. Stepping down can bring a room closer to the land while introducing internal stairs and different structural work. Draw the landing, retaining and access in both sections; the view is only one part of the decision.


Before deciding on a new house

For a new build, we would place the garage and entry beside the surveyed driveway route, then look at what excavation and construction access mean for existing vegetation. Moving a garage closer to the street may shorten the daily walk but change the planting and earthworks at the front. Test those consequences with the project team, including drainage, current planning and any applicable bushfire advice.

Our architecture services include testing the brief against access and ground conditions. Contact benssur about your Emu Heights project.


Start a conversation

Planning a home project?

Tell us the site, project type and the main decision you need help with.

No prepared brief is required.