An unused fireplace can seem an obvious thing to remove when joining two rooms. Yet the small rectangle it occupies on the plan may be only the base of masonry extending through the ceiling and roof. In a Wentworthville renovation, benssur would distinguish removing a fireplace from removing its entire construction before comparing layouts. That decision can also affect an extension, or what an owner hopes to retain within a new-home proposal.
The February 2020 heritage inventory entry for 16 Veron Street records a masonry chimney and repeats an earlier description of a living-room brick fireplace with an iron surround. The study did not inspect interiors. It is historical evidence of one home’s fabric, not confirmation of its present condition, safe operation or the controls applying to another property.

Separate the heating decision from the building decision
A household may no longer want an open fire, while still valuing the fireplace’s place in the room. Keeping that architectural element need not mean continuing to burn fuel in it. Conversely, choosing another heating system does not establish that the chimney can be removed without wider work. Operation, decommissioning and any change of appliance need appropriate specialist advice.
Before treating the projecting chimney breast as available floor area, establish its full extent and construction. The engineer and builder need to assess what is supported, what connects to it and the consequences of the proposed alteration. A retained stack above the roof cannot simply be assumed independent of the masonry below. Any partial removal requires a specifically designed solution, not a demolition instruction taken from a floor plan.
That investigation can change the comparison. Retaining the whole assembly may preserve more existing fabric but constrain the opening between rooms. Full removal, where permissible and feasible, may free the layout while involving the roof, ceilings and floors as well as the visible fireplace. Ask for both scopes to be described before deciding that the larger opening is a small extra expense.
Test the connection beside it
Suppose a fireplace stands near the proposed connection between sitting and dining. An opening to one side may provide sufficient access while keeping a substantial wall between the two uses. Its position matters: a route emerging beside the end of the dining table behaves differently from one arriving behind the chairs people use every day.
Openings on both sides could make the retained mass an island within a larger space. That may improve movement, but also creates two routes to accommodate and can leave furniture competing with circulation. A symmetrical pair of openings is not automatically the most useful arrangement. The structure must be assessed for each option; retaining the chimney does not make the adjacent walls safe to alter.
If removal is the preferred option, draw the actual benefit. Does the recovered depth allow a kitchen run, a dining table with clear circulation or a needed connection to the extension? Or does it merely enlarge an area that remains a passage? A few extra square metres are valuable only when their shape and position answer the brief.
Include the surfaces that have to meet afterwards
Taking out masonry can leave a gap in floorboards, a change in ceiling detail and unfinished wall junctions. Those are part of the renovation scope, not minor decoration to settle later. A repaired floor might deliberately record the former footprint, or a more extensive floor renewal may create continuity while sacrificing more retained material. The appropriate response depends on condition, significance and the surrounding rooms.
Where the fireplace stays, restrained contemporary joinery can meet it with a clear junction rather than imitate its detailing or bury it behind cupboards. No new fit-out should obstruct required inspection or create an unsafe relationship with an operating appliance.
Our renovation feasibility and interior planning considers these connected decisions before the plan is fixed. Establish the property’s current heritage and approval requirements, then compare the whole retained assembly with the whole removal scope. The useful result is a room connection that works, with no hidden assumption left above the ceiling.
Start a conversation
Planning a home project?
Tell us the site, project type and the main decision you need help with.
No prepared brief is required.