An older family home may contain something worth keeping even when the plan no longer works. It might be the scale of a room, the warmth of timber overhead or the sense of familiarity that comes from years of living there. A renovation is an opportunity to make those qualities useful again, not just preserve them as decoration.
Loft Architecture’s Taylors Lakes house began with a 1980s brick home whose layout no longer suited a family of five. The practice describes reworking the spaces within the existing footprint while retaining the high timber-lined ceilings. In the shared living area, the lining was painted and high skylights introduced; in the main bedroom, the original timber finish remained.
The contrast raises a decision worth making early: should the house have one consistent expression, or can different rooms respond to how they are used?

Let the rooms have their own character
A shared living area used through the day may benefit from a lighter atmosphere and stronger daylight. A bedroom might be more comfortable with a quieter, warmer sense of enclosure. Keeping a common ceiling form while allowing its finish and lighting to change can connect the rooms without making them feel identical.
We would look at the whole plan before choosing those changes. Where does the family gather? Which existing room has a quality worth building around, and which needs a different relationship to the kitchen or garden? A new opening or roof light might transform a room, but its position, structure, insulation and weather detailing need to be resolved for the actual house. It should support the plan rather than become a feature added in isolation.
An extension can give a growing household space the existing footprint cannot provide; it should also relate to the rooms that remain. For a new home, the same attention to atmosphere can shape a contemporary plan from the outset. Explore benssur’s architecture services or contact us about your Taylors Lakes project.
Start a conversation
Planning a home project?
Tell us the site, project type and the main decision you need help with.
No prepared brief is required.